The archive
A record of work that has left our floor — fabricated in-house, installed by our own crew.
Structural steelFeaturedA 340 m² load-bearing mezzanine fabricated and erected in nine days.
Gates and balustradesFeaturedForty metres of mild steel railing along an exposed marine walkway.
A three-storey helical stair with a continuous folded stringer.
Automated four-metre gates with hand-forged infill panels.
Elevated access walkway and handrail to industrial spec.
CNC-cut screen panels forming a shifting pattern across a west elevation.