Warehouse mezzanine frame
All projectsStructural steel

Warehouse mezzanine frame

A 340 m² load-bearing mezzanine fabricated and erected in nine days.

A 340 m² load-bearing mezzanine fabricated and erected in nine days. Fabricated in-house and installed by our own crew, with full weld inspection before handover.

From the build

Chat with us